I think I am going to modify one of the overflows before testing for leaks. One overflow drain slopes several inches, then goes horizontal, then slopes again into the sump. I think I am going to modify the other overflow to allow it to slope another inch or so (to help prevent back pressure). Ideally, if I had the extra space, I would want a uniform slope of at least 1/4" per foot toward into the sump.